• Home
  • T-VER
  • Premium T-VER
  • LESS
  • JCM
  • CDM
  • ติดต่อเรา
  • SEARCH
  • Home
  • T-VER
  • Premium T-VER
  • LESS
  • JCM
  • CDM
  • ติดต่อเรา
  • SEARCH
logo ghg
  • Home
  • T-VER
  • Premium T-VER
  • LESS
  • JCM
  • CDM
  • ติดต่อเรา
  • SEARCH
Login
Login / Register
  • Create an account
  • Forgot your username?
  • Forgot your password?
  • หน้าแรก
  • Premium T-VER?
    • What is Premium T-VER
    • Project administrative structure
    • Project Type
    • Project Size
    • Project Implementation
    • Conditions of Project Development
    • Positive List & Additionality
    • Local Stakeholder Consultation
    • Sustainable Development and Safeguards Assessment
    • Non-permanence Risk
    • Double counting and double use
    • Changes to Registered Project
    • Use of carbon credits
    • Data Disclosures
  • Rules and Conditions
    • Rules for Project Registration and Carbon Credit Issuance
    • Rules for VVB Requirements
    • Buffer Credit
    • Others rules
    • Fee
  • Project Development Process
    • Procedure for Project Development
    • Procedure for Project Registration
    • Procedure for Carbon Credits Issuance
    • Procedure for Renewal of Crediting Period
    • Procedure for Changes to Registered Project
    • Procedure for Opening an Account
    • Procedure for Carbon Credit Exchange
  • Validation and Verification Body
    • What is VVB ?
    • Procedure for VVB Registration
    • Manual for T-VER Validation & Verification
    • List of Registered VVB
  • Methodology
    • Sectoral Scope
    • Procedure for Development of Methodology
    • Methodology
      • Renewable energy or fossil fuel replacement
      • Improvement of the efficiency of electricity and heat generation
      • Use of public transportation system
      • Use of electric vehicle
      • Improvement of the efficiency of engine
      • Improvement of the efficiency of energy consumption in building and factory and in household
      • Use of natural refrigerant
      • Use of clinker substitute
      • Solid waste management
      • Domestic wastewater management
      • Methane recovery and utilization
      • Industrial wastewater management
      • Reduction, absorption and removal of greenhouse gases from the forestry and agriculture sectors
      • Capture, storage, and/or utilization of greenhouse gas
      • Other project specified by the Board of Directors of TGO
    • Calculation Tools
      • Forestry and Agriculture Project
      • Energy and Waste management project
    • Data for Calculation
  • Database and Statistics
    • Single and Bundled Projects
    • Programme of Activities Projects
    • Statistics of Registered Projects
    • Statistics of Carbon Credits Issuance
  • Download
  • Application
    • Application for Project Registration
    • Application for Carbon Credits Issuance
    • Application for Project Registration
    • Application for Carbon Credits Issuance
    • Submission MoC and public comments
  • FAQ
  • Thai ไทย (ภาษาไทย)
  • English (United Kingdom)
  • Home
  • Premium T-VER
  • Premium T-VER?
  • Conditions of Project Development
  • Home
  • Premium T-VER
  • Premium T-VER?
  • Conditions of Project Development

Conditions of Project Development

  • Share
  • Tweet
  • Share
  • Share
20 December 2022

Project conditions

T-VER project development criteria according to the international standard

  1. Project shall be located in Thailand.
  2. T-VER program accounts for seven type of greenhouse gas, including Carbon Dioxide (CO2), Methane (CH4), Nitrous Oxide (N2O), Hydrofluorocarbon (HFCs), Perfluorocarbon (PFCs), Sulfur Hexafluoride (SF6), and Nitrogen Trifluoride (NF3)
  3. T-VER project activity could be implemented as a single project, bundled or Programme of Activities (PoA).
  4. The project participants shall start the Premium T-VER project development before the project start date, and
    • Project type number 1-12 shall request for registration within 3 years counting from the project start date.
    • Project type number 13 and Project type number 14 shall request for registration within 5 years counting from project start date
    • Project type number 15 shall follow the condition specified by the Board of Directors of TGO.

Project start date is the date that the project owner makes any contract except in case that project type 13 : Reduction, absorption and removal of greenhouse gases from the forestry and agriculture sectors. The project start date shall be as set in the applied methodology.

 

 

Premium T-VER?

  • What is Premium T-VER
  • Project administrative structure
  • Project Type
  • Project Size
  • Project Implementation
  • Conditions of Project Development
  • Positive List & Additionality
  • Local Stakeholder Consultation
  • Sustainable Development and Safeguards Assessment
  • Non-permanence Risk
  • Double counting and double use
  • Changes to Registered Project
  • Use of carbon credits
  • Data Disclosures

WHAT IS Premium T-VER?

  • What is Premium T-VER
  • Project administrative structure
  • Project Type
  • Project Size
  • Project Implementation
  • Conditions of Project Development
  • Positive List & Additionality
  • Local Stakeholder Consultation
  • Sustainable Development and Safeguards Assessment
  • Non-permanence Risk
  • Double counting and double use
  • Changes to Registered Project
  • Use of carbon credits
  • Data Disclosures

RELATED RULES AND PROCEDURES

  • Rules for Project Registration and Carbon Credit Issuance
  • Rules for VVB Requirements
  • Buffer Credit
  • Others rules
  • Fee

VVB REGISTRATION

  • What is VVB ?
  • Procedure for VVB Registration
  • Manual for T-VER Validation & Verification
  • List of Registered VVB

METHODOLOGY

  • Sectoral Scope
  • Procedure for Development of Methodology
  • Methodology
    • Renewable energy or fossil fuel replacement
    • Improvement of the efficiency of electricity and heat generation
    • Use of public transportation system
    • Use of electric vehicle
    • Improvement of the efficiency of engine
    • Improvement of the efficiency of energy consumption in building and factory and in household
    • Use of natural refrigerant
    • Use of clinker substitute
    • Solid waste management
    • Domestic wastewater management
    • Methane recovery and utilization
    • Industrial wastewater management
    • Reduction, absorption and removal of greenhouse gases from the forestry and agriculture sectors
    • Capture, storage, and/or utilization of greenhouse gas
    • Other project specified by the Board of Directors of TGO
  • Calculation Tools
    • Forestry and Agriculture Project
    • Energy and Waste management project
  • Data for Calculation

DATABASE AND STATISTICS

  • Single and Bundled Projects
  • Programme of Activities Projects
  • Statistics of Registered Projects
  • Statistics of Carbon Credits Issuance

Project Development Process

  • Procedure for Project Development
  • Procedure for Project Registration
  • Procedure for Carbon Credits Issuance
  • Procedure for Renewal of Crediting Period
  • Procedure for Changes to Registered Project
  • Procedure for Opening an Account
  • Procedure for Carbon Credit Exchange

APPLY FOR Premium T-VER PROGRAM

  • Application for Project Registration
  • Application for Carbon Credits Issuance
  • Submission MoC and public comments

Download

Q&A


logo footer

120 Moo 9 floor
The Government Complex Commemorating His Majesty Chaeng Watthana Road, Thung Song Hong,Khet Laksi Bangkok 10210
Phone : 02-141 9841-9 | โทรสาร: 02-143 8404

Copyright © 2017 All Rights Reserved.

Contact Us |  Follow Us  facebook  twt  line  youtube  inst

นโยบายเว็บไซต์  |  นโยบายคุ้มครองข้อมูลส่วนบุคคล

Related Agencies [Our Partners]
องค์การบริหารจัดการก๊าซเรือนกระจก
กระทรวงทรัพยากรธรรมชาติและสิ่งแวดล้อม
CABON MAKET
THAI CABON LABEL
TGO Climate Action Academy (CAA)
ความรู้ด้านก๊าซเรือนกระจก
Mobile Application