• Home
  • T-VER
  • Premium T-VER
  • LESS
  • JCM
  • CDM
  • ติดต่อเรา
  • SEARCH
  • Home
  • T-VER
  • Premium T-VER
  • LESS
  • JCM
  • CDM
  • ติดต่อเรา
  • SEARCH
logo ghg
  • Home
  • T-VER
  • Premium T-VER
  • LESS
  • JCM
  • CDM
  • ติดต่อเรา
  • SEARCH
Login
Login / Register
  • Create an account
  • Forgot your username?
  • Forgot your password?
  • หน้าแรก
  • Premium T-VER?
    • What is Premium T-VER
    • Project administrative structure
    • Project Type
    • Project Size
    • Project Implementation
    • Conditions of Project Development
    • Positive List & Additionality
    • Local Stakeholder Consultation
    • Sustainable Development and Safeguards Assessment
    • Non-permanence Risk
    • Double counting and double use
    • Changes to Registered Project
    • Use of carbon credits
    • Data Disclosures
  • Rules and Conditions
    • Rules for Project Registration and Carbon Credit Issuance
    • Rules for VVB Requirements
    • Buffer Credit
    • Others rules
    • Fee
  • Project Development Process
    • Procedure for Project Development
    • Procedure for Project Registration
    • Procedure for Carbon Credits Issuance
    • Procedure for Renewal of Crediting Period
    • Procedure for Changes to Registered Project
    • Procedure for Opening an Account
    • Procedure for Carbon Credit Exchange
  • Validation and Verification Body
    • What is VVB ?
    • Procedure for VVB Registration
    • Manual for T-VER Validation & Verification
    • List of Registered VVB
  • Methodology
    • Sectoral Scope
    • Procedure for Development of Methodology
    • Methodology
      • Renewable energy or fossil fuel replacement
      • Improvement of the efficiency of electricity and heat generation
      • Use of public transportation system
      • Use of electric vehicle
      • Improvement of the efficiency of engine
      • Improvement of the efficiency of energy consumption in building and factory and in household
      • Use of natural refrigerant
      • Use of clinker substitute
      • Solid waste management
      • Domestic wastewater management
      • Methane recovery and utilization
      • Industrial wastewater management
      • Reduction, absorption and removal of greenhouse gases from the forestry and agriculture sectors
      • Capture, storage, and/or utilization of greenhouse gas
      • Other project specified by the Board of Directors of TGO
    • Calculation Tools
      • Forestry and Agriculture Project
      • Energy and Waste management project
    • Data for Calculation
  • Database and Statistics
    • Single and Bundled Projects
    • Programme of Activities Projects
    • Statistics of Registered Projects
    • Statistics of Carbon Credits Issuance
  • Download
  • Application
    • Application for Project Registration
    • Application for Carbon Credits Issuance
    • Application for Project Registration
    • Application for Carbon Credits Issuance
    • Submission MoC and public comments
  • FAQ
  • Thai ไทย (ภาษาไทย)
  • English (United Kingdom)
  • Home
  • Premium T-VER
  • Methodology
  • Procedure for Development of Methodology
  • Home
  • Premium T-VER
  • Methodology
  • Procedure for Development of Methodology

Procedure for Development of Methodology

  • Share
  • Tweet
  • Share
  • Share
20 December 2022

Premium T-VER Methodology may be proposed by TGO officials or other entities.

The procedure for approval of a methodology is as follows:

  • TGO officials or other entities prepare a proposed methodology using the form specified by TGO.
  • In the case of the proposed methodology is drafted by other entity, the proposed methodology shall be sent to TGO (Email: This email address is being protected from spambots. You need JavaScript enabled to view it. or postal mail), specifying the contact address, phone number and e-mail.
  • TGO as a secretariat, determines whether the proposed methodology is complete and communicates the result to the methodology proponent within 10 working days from the date of the receipt of the submission.
  • The proposed methodology that satisfies the completeness check shall be reviewed by external experts. TGO could invite the methodology proponent to answer questions as deemed appropriate. At the same time, TGO makes the proposed methodology publicly available for public comments through the website for 30 calendar days. 
  • TGO may revise the proposed methodology according to the comments from external experts and public.
  • Subcommittee on Consideration of GHG Mitigation Projects and Activities considers the proposed methodology. In case that the subcommittee does not approve the proposed methodology, TGO may ask the external experts to review the proposed methodology with more input from the methodology proponent. TGO revises the proposed methodology according to the received comments and then propose to the subcommittee for reconsideration.
  • The approved methodology shall be presented to the Board of Directors of TGO.
  • TGO notifies the result of the consideration to the methodology proponent.

procedure meth

Total files 2
Total downloads 220

pdf แนวทางการพัฒนาระเบียบวิธีลดก๊าซเรือนกระจกภาคสมัครใจ สำหรับ Premium T-VER
Download

docx T-VER-METH-XX-YY VERSION ระเบียบวิธีลดก๊าซเรือนกระจกภาคสมัครใจ สำหรับ... (บังคับใช้วันที่ 1 พฤศจิกายน 2566)
Download

Methodology

  • Sectoral Scope
  • Procedure for Development of Methodology
  • Methodology
    • Renewable energy or fossil fuel replacement
    • Improvement of the efficiency of electricity and heat generation
    • Use of public transportation system
    • Use of electric vehicle
    • Improvement of the efficiency of engine
    • Improvement of the efficiency of energy consumption in building and factory and in household
    • Use of natural refrigerant
    • Use of clinker substitute
    • Solid waste management
    • Domestic wastewater management
    • Methane recovery and utilization
    • Industrial wastewater management
    • Reduction, absorption and removal of greenhouse gases from the forestry and agriculture sectors
    • Capture, storage, and/or utilization of greenhouse gas
    • Other project specified by the Board of Directors of TGO
  • Calculation Tools
    • Forestry and Agriculture Project
    • Energy and Waste management project
  • Data for Calculation

WHAT IS Premium T-VER?

  • What is Premium T-VER
  • Project administrative structure
  • Project Type
  • Project Size
  • Project Implementation
  • Conditions of Project Development
  • Positive List & Additionality
  • Local Stakeholder Consultation
  • Sustainable Development and Safeguards Assessment
  • Non-permanence Risk
  • Double counting and double use
  • Changes to Registered Project
  • Use of carbon credits
  • Data Disclosures

RELATED RULES AND PROCEDURES

  • Rules for Project Registration and Carbon Credit Issuance
  • Rules for VVB Requirements
  • Buffer Credit
  • Others rules
  • Fee

VVB REGISTRATION

  • What is VVB ?
  • Procedure for VVB Registration
  • Manual for T-VER Validation & Verification
  • List of Registered VVB

METHODOLOGY

  • Sectoral Scope
  • Procedure for Development of Methodology
  • Methodology
    • Renewable energy or fossil fuel replacement
    • Improvement of the efficiency of electricity and heat generation
    • Use of public transportation system
    • Use of electric vehicle
    • Improvement of the efficiency of engine
    • Improvement of the efficiency of energy consumption in building and factory and in household
    • Use of natural refrigerant
    • Use of clinker substitute
    • Solid waste management
    • Domestic wastewater management
    • Methane recovery and utilization
    • Industrial wastewater management
    • Reduction, absorption and removal of greenhouse gases from the forestry and agriculture sectors
    • Capture, storage, and/or utilization of greenhouse gas
    • Other project specified by the Board of Directors of TGO
  • Calculation Tools
    • Forestry and Agriculture Project
    • Energy and Waste management project
  • Data for Calculation

DATABASE AND STATISTICS

  • Single and Bundled Projects
  • Programme of Activities Projects
  • Statistics of Registered Projects
  • Statistics of Carbon Credits Issuance

Project Development Process

  • Procedure for Project Development
  • Procedure for Project Registration
  • Procedure for Carbon Credits Issuance
  • Procedure for Renewal of Crediting Period
  • Procedure for Changes to Registered Project
  • Procedure for Opening an Account
  • Procedure for Carbon Credit Exchange

APPLY FOR Premium T-VER PROGRAM

  • Application for Project Registration
  • Application for Carbon Credits Issuance
  • Submission MoC and public comments

Download

Q&A


logo footer

120 Moo 9 floor
The Government Complex Commemorating His Majesty Chaeng Watthana Road, Thung Song Hong,Khet Laksi Bangkok 10210
Phone : 02-141 9841-9 | โทรสาร: 02-143 8404

Copyright © 2017 All Rights Reserved.

Contact Us |  Follow Us  facebook  twt  line  youtube  inst

นโยบายเว็บไซต์  |  นโยบายคุ้มครองข้อมูลส่วนบุคคล

Related Agencies [Our Partners]
องค์การบริหารจัดการก๊าซเรือนกระจก
กระทรวงทรัพยากรธรรมชาติและสิ่งแวดล้อม
CABON MAKET
THAI CABON LABEL
TGO Climate Action Academy (CAA)
ความรู้ด้านก๊าซเรือนกระจก
Mobile Application