กลไกลดก๊าซเรือนกระจก (Greenhouse Gas Mitigation Mechanism)

Project Type

Project Type Premium T-VER

(1) Projects in the category of renewable energy or fossil fuel replacement;

(2) Projects in the category of improvement of efficiency of electricity and heat generation;

(3) Projects in the category of public transportation system;

(4) Projects in the category of electric vehicle;

(5) Projects in the category of improvement of efficiency of engine;

(6) Projects in the category of improvement of efficiency of energy consumption in buildings and factories, and in households;

(7) Projects in the category of natural refrigerant;

(8) Projects in the category of clinker substitutes;

(9) Projects in the category of solid waste management;

(10) Projects in the category of domestic wastewater management;

(11) Projects in the category of methane recovery and utilization;

(12) Projects in the category of industrial wastewater management;

(13) Projects in the category of reduction, absorption, and removal of greenhouse gases from the forestry and agricultural sectors;

(14) Projects in the category of capture, storage, and/or utilization of greenhouse gases; 

(15) Projects in other categories as may be additionally prescribed by the Board of Directors supported by scientific reasons.

 

Length of crediting period

crediting period

  • Hits: 9664